Projects
- Project: 36-Inch Gas Transmission Pipeline from Nehbandan to Sarbisheh Client: Iran Gas Engineering and Development Company (IGEDC) Project Start Date: 2025 (1404) Project Sector: Onshore Pipelines […]
- Project: Ethylene Diamine (EDA) Plant Construction Project The project involves the construction of an EDA production plant with an annual capacity of 10,000 metric tons. The […]
- Project: Basic Design of the Zargan Pressure Control Station Client: Not specified Project Start Date: 2023 (1402) Project Sector: Pipelines and Storage Tanks Project Location: Zargan, […]
- Project: Basic Design of the Loshan Pressure Control Station Client: Not specified Project Start Date: 2023 (1402) Project Sector: Pipelines and Storage Tanks Project Location: Loshan, […]
- Project: Detailed Design of the 30-Inch Subsea Gas Pipeline from Salman Field to Siri IslProject: Detailed Design of the 30-Inch Subsea Gas Pipeline from Salman Field […]
- Project: Basic Design Studies for the 16-Inch and 24-Inch Pipelines in Dezful Client: Not specified Project Start Date: 2023 (1402) Project Sector: Pipelines and Storage Tanks […]
- Project: Yadavaran Oil Field Development Project: EPC Construction of Eight Well Pads and Access Roads Client: Petroleum Engineering and Development Company (PEDEC) Project Start Date: 2023 […]
- Project: Design and Engineering Services for the LAB2 Unit Expansion Project Client: Iran Chemical Industries Investment Company Project Start Date: 2023 Project Sector: Refining and Petrochemicals […]
- Project: Basic Design of Two 350,000-Barrel Heavy Crude Oil Storage Tanks for Qeshm Heavy Oil Refinery Client: Project Start Date: 2022 Project Sector: Pipelines and Storage […]
- Project: In 2020 (1399 in the Iranian calendar), the Iranian Oil Terminals Company awarded Tarh Novandishan the contract for engineering services, site supervision, and design review […]
- Project: Expansion of the Rubber Production Unit at Pad Jam Polymer Company using Batch Technology, with a capacity of 60,000 tons per year across three production […]
- Project: Design and Supervision of the LPG Export Jetty at Pars 2 Client: Parsa Holding Project Start Date: 2020 (1399 in the Iranian calendar) Project Sector: […]
- Project: The National Iranian South Oil Company (NISOC) undertook the construction of a manifold at the Qaleh Nar Production Unit in the Masjed Soleyman area. The […]
- Project: Design, Shop Supervision, and Senior Supervision of the Dehshir Gas Pressure Boosting Facilities Client: Iran Gas Engineering and Development Company Project Start Date: 2020 (1399 […]
- Project: Bushehr Petrochemical Phase 2, comprising Olefin, Polyethylene, and Ethylene Glycol (MEG) units, along with Site 1 utilities and offsites. The facilities cover approximately 40 hectares, […]
- Project: Jask International Crude Oil Export and Import Terminal Clients: Petroleum Engineering and Development Company (PEDEC), National Iranian Oil Engineering and Construction Company (NIOEC), and Pars […]
- Project: Site and Senior Supervision of the Construction of Gas Pipeline Operation Centers in Ilam, Hosseiniyeh, and Zahedan Client: Iran Gas Engineering and Development Company Project […]
- Project: Basic Engineering Studies for the Kharg Oil Products Unloading Jetty Client: National Iranian Oil Products Distribution Company (NIOPDC) Project Start Date: 2017 (1396 in the […]
- Project: Phase I and Phase II Design of Auxiliary Gas Pipeline Operation Centers in Ilam, Dehgolan, Hosseiniyeh, and Kuhdasht Client: Iran Gas Engineering and Development Company […]
- Project: Project Management and Control of Infrastructure Projects for the National Petrochemical Company in Special Economic Zones and Other Regions Client: National Petrochemical Company (NPC) Project […]
- Project: Design of the Seawater Return Outfall System for South Pars Gas Refinery Phases 20 and 21 Client: Oil Industries Engineering and Construction (OIEC) Project Start […]
- Project: Site Selection Studies for the Construction of 10-Million-Barrel Oil Storage Tanks in Ganaveh Client: Petro Omid Asia Company Project Start Date: 2011 (1390 in the […]
- Project: Studies and Design of the Kish Gas Supply Station Client: National Iranian Gas Company (NIGC) Project Start Date: 2008 (1387 in the Iranian calendar) Project […]
- Project: Project Management of the Miandoab Petrochemical Complex Project Background: In November 2002 (Aban 1381 in the Iranian calendar), the Government of the Islamic Republic of […]
- Project: Detailed Design Studies for Oil Storage Tanks in Mahshahr Client: National Iranian Oil Engineering and Construction Company (NIOEC) Project Start Date: 2007 (1386 in the […]
- Project: Return Water System Design for Phases 9 and 10 of South Pars Refinery Client: Oil Industry Engineering and Construction (OIEC) Project Start: 2007 Project Sector: […]
Site Design for the Support Services Facilities of the National Iranian Gas Export Company in Tombak
Site Design for the Support Services Facilities of the National Iranian Gas Export Company in Tombak
Project: Site Design for the Support Services Facilities of the National Iranian Gas Export Company in Tombak Client: National Iranian Gas Export Company (NIGEC) Project Start […]- Project: Project Management of the Adish Qeshm Gas Condensate Refinery Client: AIOC Company Project Start Date: 2007 (1386 in the Iranian calendar) Project Sector: Project Management […]
- Project: Comprehensive Development Master Plan Studies for the Tombak Region for Four LNG Projects Project Background:The Tombak region is located approximately 40 km west of Asaluyeh […]
- Project: Design and Supervision of Utilities and Package 3 for the Kangan LPG Refinery Client: Iran LNG Project Start Date: 2006 (1385) Project Sector: Refining and […]
- Project: Comprehensive Plan for Site Selection of CNG Refueling Stations and Vehicle Conversion Workshops Across Iran Project Overview: The objective of this study was to estimate […]
- Project: Bushehr LPG Export Terminal Client: Iran Liquefied Gas Company (ILC) Project Start Date: 2006 (1385 in the Iranian calendar) Project Sector: Offshore Projects Project Location: […]
- Project: Feasibility Study for Routing Oil Facilities Through the Lake Urmia Causeway Client: Shahid Kalantari Freeway Project Executive Office Project Start Date: 2005 (1384) Project Sector: […]
- Project: Studies for the Rehabilitation and Development Plan of Mahshahr Oil Products Export Terminal Client: National Iranian Oil Engineering and Construction Company (NIOEC) Project Start Date: […]
- Project: Engineering Services for the Construction of Storage Tanks Client: Iran Commercial and Port Services Company Project Start Date: Not specified Project Sector: Refining and Petrochemicals […]
- Project: Design and Engineering of an LPG Marine Export Terminal Client: Project Start Date: Project Sector: Offshore Terminals Project Location: Kangan Services Provided: Design of the […]
- Project: Neka–Sarakhs Pipeline Client: Not specified Project Start Date: Not specified Project Sector: Pipelines and Storage Tanks Project Location: Neka to Sarakhs, Iran Services Provided: Updating […]