Key Projects
- Project: 36-Inch Gas Transmission Pipeline from Nehbandan to Sarbisheh Client: Iran Gas Engineering and Development Company (IGEDC) Project Start Date: 2025 (1404) Project Sector: Onshore Pipelines […]
- Project: Ethylene Diamine (EDA) Plant Construction Project The project involves the construction of an EDA production plant with an annual capacity of 10,000 metric tons. The […]
- Project: Basic Design of the Zargan Pressure Control Station Client: Not specified Project Start Date: 2023 (1402) Project Sector: Pipelines and Storage Tanks Project Location: Zargan, […]
- Project: Basic Design of the Loshan Pressure Control Station Client: Not specified Project Start Date: 2023 (1402) Project Sector: Pipelines and Storage Tanks Project Location: Loshan, […]
- Project: Basic Design Studies for the 16-Inch and 24-Inch Pipelines in Dezful Client: Not specified Project Start Date: 2023 (1402) Project Sector: Pipelines and Storage Tanks […]
- Project: Design and Engineering Services for the LAB2 Unit Expansion Project Client: Iran Chemical Industries Investment Company Project Start Date: 2023 Project Sector: Refining and Petrochemicals […]