Project: Bushehr Petrochemical Phase 2, comprising Olefin, Polyethylene, and Ethylene Glycol (MEG) units, along with Site 1 utilities and offsites. The facilities cover approximately 40 hectares, opposite Kavian Petrochemical Complex in the southern section of Bushehr Petrochemical Site 2. Feedstock for Phase 2 is supplied via the West Ethylene Pipeline from Damavand Petrochemical and from Bushehr Petrochemical Phase 1.
Client: Jahanpars Engineering and Construction Company
End Client: Bushehr Petrochemical Company
Project Start Date: 2020
Project Sector: Refinery and Petrochemical
Project Location Bushehr Province, Iran
Services Provided: Jahanpars Engineering and Construction Company is responsible for the engineering, procurement, construction, commissioning, and unit interfaces for the utilities and offsites facilities. Tarh No Andishan is responsible for all detailed engineering, procurement engineering, and field engineering services for the project.
The utilities facilities include a GIS substation, two cooling units serving the Olefin and MEG units, a wastewater treatment unit (WWT), metering units for measuring received ethane, liquid ethylene, and gaseous ethylene, a gas unit, and various industrial and non-industrial buildings.
At peak project activity, the detailed engineering team comprised 60 personnel, while the field engineering team consisted of 9 personnel.
Project Status: Completed