طرح توسعه ميدان نفتي يادآوران، احداث 8 فقره محوطه سرچاهي(well pad) و جاده هاي دسترسي به روش EPC
Development of the Yadavaran Oil Field, Construction of 8 Well Pads and Access Roads on an EPC Basis
September 10, 2026
مهندسي تفصيلي، مهندسي خريد و مهندسي كارگاهي واحد توليد اتيلن دي آمين
Detailed Engineering, Procurement Engineering, and Site Engineering for the Ethylene Diamine Production Unit
September 10, 2026

Employer’s Consultancy and Supervision Services for the Abadan–Nezamieh Pipeline Project (Detailed Design, Engineering, Procurement, Site Supervision, and General Supervision)

Project: Employer’s Consultancy and Supervision Services (Detailed Design, Engineering, Procurement, Site Supervision, and General Supervision) for the Abadan–Nezamieh Pipeline Project

Client: National Iranian Oil Products Pipeline and Telecommunication Company (NIOPDC)

Project Start: 2024 (Iranian Calendar: 1403)

Technology / Sector: Transmission Pipelines and Storage Tanks

Project Location: Abadan–Nezamieh, Iran

Services Provided: Provision of Employer’s Consultancy Services, supervision of detailed design, engineering and procurement, site and general supervision for the project involving the rerouting of the initial section of the 12-inch Abadan–Nezamieh products pipeline over an approximate length of 25 km, and recoating of approximately 6,300 m of the existing pipeline, on an EPC basis.

Status: Completed

مختصات پروژه وارد نشده است.