Basic Design Studies for the 16-Inch and 24-Inch Pipelines in Dezful
October 27, 2026
Neka–Sarakhs Pipeline
October 27, 2026
36-Inch Gas Transmission Pipeline from Nehbandan to Sarbisheh

Project: 36-Inch Gas Transmission Pipeline from Nehbandan to Sarbisheh

Client: Iran Gas Engineering and Development Company (IGEDC)

Project Start Date: 2025 (1404)

Project Sector: Onshore Pipelines

Project Location: Nehbandan to Sarbisheh, South Khorasan Province, Iran

Services Provided:

Senior supervision and site supervision for the construction of the 36-inch gas transmission pipeline from Nehbandan to Sarbisheh.

Status: Ongoing