نظارت کارگاهی و عالیه احداث مراکز بهره برداری خط لوله گاز ایلام، حسینیه و زاهدان
Site and Senior Supervision of the Construction of Gas Pipeline Operation Centers in Ilam, Hosseiniyeh, and Zahedan
October 27, 2026
طراحی مرحله اول و دوم مراکز فرعی بهره برداری خط لوله ایلام، دهگلان، حسینیه و کوهدشت
Phase I and Phase II Design of Auxiliary Gas Pipeline Operation Centers in Ilam, Dehgolan, Hosseiniyeh, and Kuhdasht
October 27, 2026
Basic Engineering Studies for the Kharg Oil Products Unloading Jetty

Project: Basic Engineering Studies for the Kharg Oil Products Unloading Jetty

Client: National Iranian Oil Products Distribution Company (NIOPDC)

Project Start Date: 2017 (1396 in the Iranian calendar)

Project Sector: Pipelines and Storage Tanks

Project Location: Kharg Island, Bushehr Province, Iran

Services Provided: Basic design of a petroleum products unloading jetty for the Kharg Oil Depot, with a capacity of 2,000 tonnes, including shore-based facilities and transfer pipelines connecting the jetty to the existing oil depot on the island.

Project Status: Completed